MAKO WEBSITE DEVELOPMENT

TOKEN CARD DATA INTEGRATION ROADMAP

From source-gated placeholders to verified live token metrics — now extending into scan utilities.

REPLAY. LEGITIMACY.
FINALITY. EXTENSIBILITY.
GOVERNED. DETERMINISTIC.
10%20%30%40%50% 60%70%80%90%100%
1
MAKO PayFlow
On Hold — Shelved
→ MAKO PayFlow roadmap
2
Contract Scan
Live
→ Contract Scan roadmap
3
LP Rescue
TBD
4
MAKO — Backup Migration to BSC
TBD
→ Backup Migration roadmap
5
Wallet Trace L2
TBD
6
Contract Scan L2
TBD
7
Wallet Trace L3
TBD
8
Contract Scan L3
TBD
9
LP Rescue L3
TBD
10
LOOP Network Health Monitoring
Design Complete
→ LOOP Health Monitoring roadmap
11
MAKO Harvester
Live — V2 Planning
→ MAKO Harvester roadmap
12
MAKO Liquidity Pools
Pre-IV&V — independent pre-review found fixes needed; fixes in progress
→ MAKO Liquidity Pools roadmap
13
MakoSig
Live
→ MakoSig roadmap
14
Bridge Wizard V7 (BSC→Loop)
Mechanically Live — Pre-Launch
→ Bridge Wizard V7 roadmap
15
Bridge Wizard V8 (Loop→BSC)
Registered — Relayer Live
→ Bridge Wizard V8 roadmap
16
MAKO Web — Weekly Roadmap Sync
Green — Automation Live
→ MAKO Web roadmap
17
MAKO PayFlow V2 — Buy LOOP
On Hold — Parked, Pre-IV&V
→ MAKO PayFlow V2 roadmap
18
MAKOv2
In Progress
→ MAKOv2 roadmap

✓ What We Have Achieved (Live)

◎ IV&V Standards

IEEE 1012 / SCWE Governance — Depth & Completeness Mandate

MAKO enforces deterministic IV&V rigor: (1) Automated unit & integration test suites with 100% critical-path coverage, run before every commit. (2) Independent code review by external evaluators against both SCVS (source code vulnerability standards) and SWVS (secure web app vulnerability standards), with documented remediation and re-verification on every finding. (3) On-chain contract verification — all deployed contracts independently re-verified against their source commit; state consistency checked across live mainnet. (4) Live end-to-end acceptance testing with documented evidence trails: real transactions, real wallet signatures, operator-verified execution traces, before any green status is issued. (5) Evidence completeness gates — no milestone advances without reconstructable, hash-verified audit logs. (6) No security-gate bypass — findings block deployment; remediation and independent re-verification are mandatory before cutover. Multiple rounds per cycle are standard, not exceptional.

Current Rigor Principle
  • Green status requires: live + independently verified + operator acceptance + documented evidence
  • IV&V FAIL blocks production cutover; no workarounds or exceptions
  • Each remediation cycle includes independent re-verification before clearance

🧭 The Road Ahead (Scan Utilities)

See the milestone cards above for what's next in detail. This panel covers delivery mechanics that don't have their own milestone card:

  1. Automate the deploy pipeline (still manual today)
On hold (2)
Gold links open the in-development subproject's own roadmap. Cross-project linking convention pending MAKO-Core standardization.
Our Web Principles
Target-Only EditsSmall, bounded changes
Source-Backed MetricsNo guessed values
Browser VerifiedUI checked visually
Protected Paths ExcludedNo unrelated staging
Local-First QAValidate before checkpoint
Checkpoint DisciplineCommit only verified work
Current IV&V in Work
Bridge V7/V8 — preparing a formal IV&V request (process issued by MAKO Core 2026-10-04)
Sub Project
MAKO Bridge (MAKOv2 Cross-Chain)
Milestone Being Tested
18b-18c: Final IV&V and Governance Cutover
Current Status
Round 9 FAIL (2026-10-02); the Round 10 candidate frozen 2026-10-03 was itself superseded the next day. MAKO Core's 2026-10-04 response withheld deploy approval pending ten findings; as of 2026-10-04 all ten are closed (including the Site5 bridge cron intervals, corrected 2026-10-05 to the required 15-minute minimum). The one batch commit (not yet started) and MAKO Core's blind pre-review remain ahead; not yet resubmitted for a new IV&V task order. Core design remains confirmed sound
Last Updated
October 18, 2026 at 08:57 AM EDT
Source POA&M last reviewed
report/planning/MAKO-WEB-POAM.md: 2026-10-18T12:57Z
Green: Complete — live + operator verified Yellow: In development — active work in progress Red: Pending or not started GOVERNED. DETERMINISTIC. IEEE 1012 Standards. SCWE Governance. Source of truth: report/planning/MAKO-WEB-POAM.md.