Subproject Roadmap
Last Updated: October 21, 2026 at 08:55 PM EDT
The Loop→BSC leg of MAKOv2's cross-chain bridge: burn MAKOv2 on Loop Network, mint the equivalent on BSC via a governance-controlled adapter. A newer, materially earlier-stage effort than the V7 leg — contracts are deployed and verified, with the adapter registration and mint ceiling executed and independently verified on 2026-09-17.
This roadmap covers MAKO Bridge's own build/validation work. Once public production is authorized, this leg will be handed to the MAKO Web Team for integration into the live site, following the same request/answer/ POA&M handoff pattern already used for Contract Scan. It does not yet appear on the live site's product surface — this page tracks the work required before that handoff can happen.
← Back to Development RoadmapMAKO Bridge Team is responsible for keeping this POA&M and all milestone status current.